Moving on to installment two!
The scaffolding arrived and was set up early. This gave the bricklayers plenty
of time to finish up the front of the house. Also the elevators were installed
and the rest of the windows were placed up. The Plumbers showed up early
and installed some of the plumbing fixtures in the bathroom upstairs and
opened up the chimeny downstairs to fit the half bathroom. Meanwhile throughout
the house the floor and walls were done. It was a whole mess of contractor
after contractor. After lunch most of house was convered in brick. The roofers
where in and out while placing the new roof up. The house is just about ready
to be downloaded.
Rick
Tomorrow Finishing Touches! |